Home/Case study/Province of Ascoli Piceno
Public Administration · Ascoli Piceno

Province of Ascoli Piceno

I.F.M. runs energy and technical services for the Province of Ascoli Piceno’s buildings, from gas supply to the operation and efficiency upgrade of their heating systems.

Client Province of Ascoli Piceno
Project at a glance
Client
Province of Ascoli Piceno
Location
Ascoli Piceno
Period
2022 – 2031
Portfolio
6 school campuses and 1 administrative office, approx. 80,000 m²

For the Province of Ascoli Piceno, I.F.M. provides energy services and building services maintenance for six school campuses and the administrative headquarters. An energy audit, new boiler plant and remote management have cut consumption without lowering service levels.

The client

The contract falls under the Integrated Energy and Related Services framework agreement for public administrations, 4th edition, Lot 10 – Marche and Abruzzo 1, and was awarded to I.F.M. as part of a consortium with ENGIE and UNIENERGIA.

The portfolio comprises six school campuses and one administrative office, totalling around 80,000 m². The buildings house secondary schools offering a range of courses, teaching laboratories, offices and shared spaces. Their systems must run reliably throughout the school year while keeping energy use under control.

The challenge

Many of the boiler rooms relied on outdated technology and were well past their prime. The result was poor efficiency, high consumption and running costs, frequent maintenance call-outs and limited compliance with current standards for efficiency, reliability and safety. Optimising energy use in the schools required a structured programme of technical modernisation.

The solution

I.F.M. put in place an integrated energy management and maintenance programme covering the heat supply service, including natural gas supply, the electricity service and technical services for HVAC and electrical systems:

  • more frequent operation and routine maintenance, giving closer monitoring and fewer malfunctions;
  • an energy audit of the portfolio to identify improvement opportunities and set priorities;
  • boiler room upgrades, replacing obsolete equipment with high-efficiency condensing boilers and heat pumps;
  • installation and operation of a monitoring and remote management system to supervise plant remotely and fine-tune operating conditions;
  • preparation and updating of the buildings’ energy performance certificates.

The outcome is more efficient plant, lower consumption, more reliable infrastructure and greater comfort for students, teachers and staff.

Technology

The new condensing boilers and heat pumps have improved system efficiency and reduced the energy use and emissions associated with heat generation. Remote monitoring and management systems allow the main operating parameters to be controlled remotely, faults to be detected early and maintenance to be scheduled more effectively.

Why it stands out

The contract replaces fragmented services with a single Global Service and one party accountable for buildings and systems as a whole. Savings come from better plant performance and management, not from cutting service levels: comfort and indoor climate conditions are maintained throughout the school year.

The multi-year term has made it possible to plan structural investment with lasting effects on consumption and emissions. The Province also now has a complete, up-to-date picture of its building services, energy use and building performance.

A single point of contact for buildings and infrastructure

Facility, energy, works and smart city: tell us what you need.