An ageing plant portfolio turned into a more efficient, monitored and reliable infrastructure, with a single party accountable for the whole building and its systems.
The client
The 185th Paratroopers Reconnaissance and Target Acquisition Regiment “Folgore”, part of the Italian Army Special Forces Command, operates under demanding requirements for efficiency, operational continuity and infrastructure security in support of its institutional and training activities.
The managed estate covers around 16,000 m² of buildings serving logistical, operational, residential and administrative functions: dormitories, command offices, classrooms and training rooms, staff accommodation, offices, an infirmary, a canteen, a laundry and plant rooms. The contract falls under the Consip Integrated Energy Service 4 framework agreement, Lot 9 – Tuscany, and covers the energy service, the electricity supply service and the operation of air conditioning and electrical systems.
The challenge
The heating plants relied on outdated, ageing technology. The result was poor energy performance, high fuel consumption, heavier maintenance needs and reduced reliability.
The systems also had to be brought up to current safety, energy efficiency and environmental standards, without disrupting the Regiment’s operational, training and logistical activities.
The solution
IFM introduced an integrated programme of energy efficiency and plant management improvements:
- More routine maintenance: higher maintenance frequencies to improve heating plant efficiency, cut consumption and reduce breakdowns.
- Energy upgrades: work on the systems to optimise performance, lower running costs and keep occupants comfortable.
- Monitoring and supervision: a system linked to a remote management and control platform, allowing operating parameters to be checked remotely and faults to be spotted early.
- Energy audit of the whole site, to identify improvement opportunities and set priorities.
- Energy performance certificates: drafted and kept up to date to ensure ongoing compliance.
Technology
High-efficiency condensing boilers and heat pumps were installed in the heating plants to improve performance and reduce consumption and emissions. Remote control, supervision and monitoring systems were upgraded to allow centralised plant management, real-time control of operating parameters and deeper analysis of energy performance.
Why it stands out
The project applies an integrated Global Service model: one contract and one accountable provider in place of fragmented, separately tendered services. The nine-year term made it possible to plan significant investment in buildings and systems, with lasting benefits for consumption, emissions and environmental impact.
The Administration now has a complete, up-to-date picture of its estate, its energy use and the performance of its systems. Maintenance spending has become a results-driven investment, built on efficiency, sustainability and continuous improvement.