Home/Case study/Borgo Trento Hospital, Verona
Healthcare · Verona

Borgo Trento Hospital, Verona

IFM delivered the building and services works for 30 intensive care beds and 14 high-dependency beds in Pavilion 12 of Borgo Trento Hospital.

Client Verona Integrated University Hospital Trust (AOUI Verona)
Project at a glance
Client
Verona Integrated University Hospital Trust (AOUI Verona)
Location
Borgo Trento Hospital, Verona
Period
2023 – 2024
Portfolio
Pavilion 12, within a 26-building campus

In Pavilion 12 of Borgo Trento Hospital, IFM delivered 30 intensive care beds and 14 high-dependency beds as part of Italy’s national programme to expand hospital capacity for the COVID-19 emergency. The works were carried out with the hospital fully operational.

The client

Verona Integrated University Hospital Trust is one of the leading healthcare centres in northern Italy, combining patient care, research and university teaching on a highly specialised campus that never closes.

Borgo Trento Hospital comprises 26 buildings housing wards, outpatient clinics, research, diagnostics, operating theatres and support services. It is a complex setting, both organisationally and technically, with critical building services.

The challenge

The aim was to increase critical and high-dependency care capacity within the tight timescales imposed by the emergency, without interrupting clinical activity.

Building new intensive care areas inside a working hospital requires close coordination between construction and services works, to keep disruption to a minimum and maintain high standards of safety and quality. In a hospital, plant availability and service continuity are essential for care, treatment and research.

The solution

The project combined building and services upgrades for the new care areas. The works covered:

  • building works for the intensive and high-dependency care areas;
  • technical networks and specialist electrical systems;
  • air conditioning systems;
  • medical gas distribution;
  • the infrastructure needed to run the new areas.

Activities were organised to keep healthcare services running and meet the deadlines set by the emergency.

Technology

The installations include steam generation systems for producing and distributing thermal energy, which call for specialist skills in operation, control, maintenance and safety.

In the ward areas, the services are designed around patient comfort and safety, with technology for indoor climate control and lighting management. Precise monitoring and control of environmental conditions support the quality of both the spaces and the care provided.

Why it stands out

The project brings building, services and functional requirements together in a single strategy, within a strategic healthcare facility that also serves as a reference point in emergencies.

The result is a model of intervention notable for its technical complexity and the importance of the infrastructure, with tangible benefits in safety, reliability and continuity of service.

A single point of contact for buildings and infrastructure

Facility, energy, works and smart city: tell us what you need.